Electronics International MVP-50T User Manual
Page 29
3.0
3.0
3.0
3.0
3.0
Install the EDC Wire Harnesses
Install the EDC Wire Harnesses
Install the EDC Wire Harnesses
Install the EDC Wire Harnesses
Install the EDC Wire Harnesses
and
and
and
and
and
Route Wires
Route Wires
Route Wires
Route Wires
Route Wires
3.1 Attach the three EDC 37-pin Wire Harnesses to the EDC:
3.2 Connect the EDC Harness to the Temperature Probes:
3.3 Connect the EDC Harness to the Pressure Transducers:
3.4 Connect the EDC Harness to the Shunt:
3.5 Connect the EDC Harness to the Fuel Flow Transducer:
3.6 Connect the RFLM-4-x Harness to the EDC Connector and to the Resistive Fuel
Level Sensors:
3.7 Connect the EDC Harness to the Capacitive Fuel Level Probes:
3.8 Connect the EDC Harness to the P-300M Magnetic Fuel Level Senders:
3.9 Connect the EDC Harness (Volts Measurement Pin) to the Bus:
3.10 Connect the EDC Harness to the N1 and/or N2 Tach Generator:
3.11 Connect the EDC Harness to the VI-221's (Voltage Interface Units):
3.12 Connect the EDC Harness to Power and Ground:
3.13 Route the EDC RS422 Wires to the MVP Connector:
23