Figure 3-9, Figure 3-10, Figure 3-9: figure 3-10 – Innotech Device Network Cabling User Manual
Page 35
Innotech Device Network Cabling Installation Instructions
© Mass Electronics Pty Ltd 2007
Chapter 3 – Sub Network Devices
Page 35
EXAMPLE 3:
This example shows a Sub System Network with VAVMax and MiniMAX controllers where the IG01 is in
the middle of the run.
EXAMPLE 4:
This example shows a Sub System Network with VAVMax and MiniMAX controllers, with a repeater
where the repeater is in the middle of the run.
Figure 3-9: Sub System Network with IG01 in the middle of a run
Figure 3-10: Sub System Network with a Repeater in the middle of a run
Both ends of a run must have the EOL jumpers fitted, it does not have to be a primary device.
NOTE
Only one side of the repeater is in the middle of a run. The repeater has the EOL jumper fitted on port 1 but not on
port 2.
NOTE