EXAMPLE 3:

This example shows a Sub System Network with VAVMax and MiniMAX controllers where the IG01 is in

the middle of the run.

EXAMPLE 4:

This example shows a Sub System Network with VAVMax and MiniMAX controllers, with a repeater

where the repeater is in the middle of the run.

Figure 3-9:  Sub System Network with IG01 in the middle of a run

Figure 3-10:  Sub System Network with a Repeater in the middle of a run

Both ends of a run must have the EOL jumpers fitted, it does not have to be a primary device.

NOTE

Only one side of the repeater is in the middle of a run. The repeater has the EOL jumper fitted on port 1 but not on

port 2.