Operation, Machine preparation, Tractor requirements – Kinze Grain Carts Rev. 7/14 User Manual
Page 15: Tractor preparation and hookup, Machine preparation -1, Tractor requirements -1, Tractor preparation and hookup -1
TM
Grain Cart
M0238-01
5/12
2-1
Operation
MACHINE PREPARATION
Lubricate grain cart per lubrication information in this manual prior to initial operation and at prescribed intervals. Make
sure all tires are properly inflated or track tension is properly adjusted before each use. Check drive V-belts for proper
tension and alignment. Torque all wheel lug nuts to specified torque.
TRACTOR REqUIREMENTS
Consult your dealer for information on horsepower requirements and tractor compatibility. Two remote SCV’s are
required for remote joystick operation and five SCV’s are required for standard cab operation . A 12 volt DC electrical
system is required on all sizes to operate safety/warning lights, auger-mounted work light, optional electronic scale
system, or electronic roll tarp.
TRACTOR PREPARATION AND HOOKUP
1. Slide tractor drawbar in as far as possible and still allow PTO shaft to have sufficient clearance to prevent damage
to driveline components when making sharp turns and operating over uneven ground.
NOTICE
Clevis hitch (hammer strap style) drawbars may need to be
removed to prevent damage to PTO assembly.
NOTICE
Adjust tractor drawbar to prevent severe bends in PTO U-joint
angles and to allow sufficient clearance between tractor drawbar/
hitch pin and PTO shaft.
2. Position PTO as far right of hitch as possible until parking jack is raised.
Avoid clevis hitch interference
PTO shaft positioned for tractor hookup