Chapter six: operating your rpc – Lyntec RPC User Manual

Page 37

Advertising
background image

139-0498-01.37

37

Chapter Six--Operation

Chapter Six: Operating your RPC

Figure 6-1

Using the built-in web page

To operate the RPC using the built in web page, select the
control tab from the top of the page. Once on the CONTROL
page, simply click each breaker for individual control. Or,
click a zone for zone control. “All zones ON” and “Hurry-Off ”
commands can also be executed from this page.

Using a secondary controller

For DMX, follow the manufacturer’s instructions using the DMX
addresses entered in the NETWORK page ( see pang 26).

RS-232 and TCP/IP schemes are in Appendix B (page 38).

Advertising