3 commissioning the control, 2 entry of the plc-program, 3 testing the emergency stop routine – HEIDENHAIN TNC 306 Technical Manual User Manual
Page 242: 4 testing the direction of traverse
![background image](/files/815307/content/doc242.png)
4-142
TNC 406/TNC 306
15 Commissioning and start-up procedure
2/97
15.3 Commissioning the control
The preparation of the machine in accordance with section 16.2 must be completed before the
machine parameters for the commissioning can be optimized.
Before connecting the control, the NC- and PLC- supply voltages and the ground connections should
be tested once more (see "Mounting and Electrical Installation ").
15.3.1 Entry of the provisional and pre-defined machine parameters
After switching on the machine for the first time, the control will first display the message
"Operation parameters erased", which means that the machine parameters still have to be entered
(see "Machine parameters").
Most machine parameters can be pre-defined and entered according to the machine parameter list
and the functional descriptions. The parameters which affect the control loop must be assigned
provisional values (see section 16.3.6).
In order to avoid lengthy delays on restarting during the commissioning of the control, the memory
test can be suppressed by MP7690 (see section "Display and operation").
15.3.2 Entry of the PLC-program
A complete PLC-program for all machine functions must be created for commissioning and stored
either in EPROM or RAM (see "PLC-programming").
Machine parameter MP4010 (see section "Display and operation") selects whether the processing
uses a PLC-program from the EPROM or the RAM.
The PLC-program in RAM is used for commissioning purposes. It only makes sense to create an
EPROM when all functions are operating without error.
In case of doubt, please contact HEIDENHAIN customer service.
15.3.3 Testing the EMERGENCY STOP routine
Since the EMERGENCY STOP circuit is very important for the machine it is vital that it is tested.
–
Test the Function "Control operational" according to the section "EMERGENCY STOP routine."
–
Test the EMERGENCY STOP-circuit by pressing the EMERGENCY STOP keys and by traversing
past the EMERGENCY STOP limit switches.
15.3.4 Testing the direction of traverse
Test the controls for the direction of traverse according to the following diagram (effective machine
parameters: MP210 count direction of the encoder signals, MP1040 polarity of the nominal value
voltage, MP1320 direction of traverse on passing over the reference marks).