Before initial start-up, Job data required, Equipment required – Carrier 19XL User Manual

Page 125

Advertising
background image

Before Initial Start-Up

Job Data Required

list of applicable design temperatures and pressures (product data submittal)

machine certified prints

starting equipment details and wiring diagrams

diagrams and instructions for special controls or options

19XL Installation Instructions

pumpout unit instructions

Equipment Required

mechanic’s tools (refrigeration)

digital volt-ohmmeter (DVM)

clamp-on ammeter

electronic leak detector

CAUTION

CAUTION

!

Do not reset starter loads or any other starter safety for 30 seconds after the
compressor has stopped. Voltage output to the compressor start signal is main-
tained for 10 seconds to determine starter fault.

Advertising