Transfer refrigerant from storage tank to machine – Carrier 19XL User Manual

Page 186

Advertising
background image

Transfer Refrigerant from Storage Tank to Machine

1. Equalize refrigerant pressure.

a. Use the Control Test Terminate Lockout to turn on water pumps and monitor pressures.

b. Close pumpout/storage tank valves 2, 4, 5, and 8, and close machine charging valve 7;

open machine isolation valves 11, 12, 13, and 14 (if present).

c. Open pumpout/storage tank valves 3 and 6, open machine valves 1a and 1b.

d. Gradually crack open valve 5 to increase machine pressure to 68 psig (469 kPa) for

HCFC-22, 35 psig (141 kPa) for HFC-134a. Slowly feed refrigerant to prevent freeze up.

Valve

1a

1b

2

3

4

5

6

7

8

11

12

13

14

Condition

C

C

C

C

C

Click here for Figure 36 — 19XL Pumpout Unit Wiring Schematic

Click here for Figure 37 — Optional Pumpout System

Advertising