Figure 46: reinstalling an fpc, Insert the tabs into the slots, Tighten the captive screws completely – Juniper Networks MX480 User Manual

Page 105

Advertising
background image

Figure 46: Reinstalling an FPC

OK

MASTER

FAN

ONLINE
OFFLINE

0

1

1

0

FAIL

FAIL

PEM

FAIL

FAIL

FAIL

FAIL

FAIL

FAIL

ESD

OK

OK

OK

OK

OK

OK

OK

2

3

4

5

ACO/LT

YELLOWALARM

REDALARM

NC

NO

C

NC

NO

C

MX480

REO

RE1

0 1 2 3

g004405

Related

Documentation

Preventing Electrostatic Discharge Damage to an MX480 Router on page 248

Tools Required to Install the MX480 Router with a Mechanical Lift on page 69

Removing Components from the MX480 Router Before Installing It with a Lift on
page 69

Installing the MX480 Router Using a Mechanical Lift on page 74

Installing the MX480 Router Cable Management Bracket on page 81

Installing the MX480 Router Cable Management Bracket

The cable management brackets attach to both sides of the router. To install the cable
management brackets (see

Figure 47 on page 82

):

1.

Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
the strap to one of the ESD points on the chassis.

2.

Position the cable management brackets on the front sides of the chassis.

3.

Insert the tabs into the slots.

4.

Tighten the captive screws completely.

81

Copyright © 2013, Juniper Networks, Inc.

Chapter 7: Installing the MX480 Router with a Mechanical Lift

Advertising