Preparing the Site for MX480 Router
Installation

MX480 Site Preparation Checklist on page 53

MX480 Router Rack Requirements on page 54

MX480 Router Clearance Requirements for Airflow and Hardware
Maintenance on page 56

MX480 Router Cabinet Requirements on page 57

MX480 Site Preparation Checklist

The checklist in

Table 20 on page 53

summarizes the tasks you must perform when

preparing a site for router installation.

Table 20: Site Preparation Checklist

Date

Performed By

For More Information

Item or Task

“MX480 Router Environmental
Specifications” on page 283

Verify that environmental factors such as
temperature and humidity do not exceed router
tolerances.

“MX480 Router Rack Requirements”
on page 54

,

“MX480 Router Cabinet Size and
Clearance Requirements” on page 57

Select the type of rack or cabinet.

“MX480 Router Rack Requirements”
on page 54

,

“MX480 Router Clearance
Requirements for Airflow and
Hardware Maintenance” on page 56

,

“MX480 Router Cabinet Size and
Clearance Requirements” on page 57

Plan rack or cabinet location, including required
space clearances.

“MX480 Router Rack Requirements”
on page 54

If a rack is used, secure rack to floor and building
structure.

Acquire cables and connectors.