Juniper Networks MX480 User Manual

Page 205

Advertising
background image

CB 0 status:
State Offline
Power 1 Disabled
Power 2 Disabled

12.

Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
the strap to one of the ESD points on the chassis.

13.

Remove and replace the offline SCB on the router with the enhanced SCB. Use the
replacement procedure described in

“Removing an MX480 SCB” on page 174

.

14.

Verify that the installation is successful and SCB0 is online by issuing the

show chassis

environment cb 0

command:

user@host>

show chassis environment cb 0

CB 0 status
State Online
Temperature 30 degrees C / 86 degrees F

Other details, such as power, are also displayed along with the state.

15.

Verify that the fabric planes come online correctly by issuing the

show chassis fabric

summary

command:

user@host>

show chassis fabric summary

Plane State Uptime
0 Online 2 minutes, 5 seconds
1 Online 1 minute, 55 seconds
2 Online 1 minute, 43 seconds
3 Online 1 minute, 33 seconds

16.

Verify that the backup Routing Engine is back online by issuing the

show chassis

routing-engine 0

command:

user@host>

show chassis routing-engine 0

Routing Engine Status:
Slot 0:
Current State Backup

17.

Verify the alarms by issuing the

show chassis alarms

command:

user@host>

show chassis alarms

Alarm Time Class Description
2011-06-01 13:26:56 EDT Major CB fabric links require upgrade/training
2011-06-01 12:10:41 EDT Major Require a fan tray upgrade

The major alarm has changed from

CB fabrics are of mixed types

to

CB fabric links

require upgrade/training

, as a switch control board requires training to change links

from 3G speed to 6G speed of the enhanced SCB. This alarm is displayed until the 3G
to 6G link transition is completed.

181

Copyright © 2013, Juniper Networks, Inc.

Chapter 14: Replacing MX480 Hardware Components

Advertising