Figure 40: removing an fpc – Juniper Networks MX480 User Manual

Page 98

Advertising
background image

Figure 40: Removing an FPC

OK

MASTER

FAN

ONLINE
OFFLINE

0

1

1

0

FAIL

FAIL

PEM

FAIL

FAIL

FAIL

FAIL

FAIL

FAIL

ESD

OK

OK

OK

OK

OK

OK

OK

2

3

4

5

ACO/LT

YELLOWALARM

REDALARM

NC

NO

C

NC

NO

C

MX480

REO

RE1

0 1 2 3

g004408

Related

Documentation

Preventing Electrostatic Discharge Damage to an MX480 Router on page 248

Tools Required to Install the MX480 Router with a Mechanical Lift on page 69

Installing the MX480 Router Using a Mechanical Lift on page 74

Reinstalling Components in the MX480 Router After Installing It with a Lift on page 76

Installing the MX480 Router Using a Mechanical Lift

Because of the router's size and weight—up to 163.5 lb (74.2 kg) depending on the
configuration—we strongly recommend that you install the router using a mechanical
lift. To make the router light enough to install with a lift, you must first remove most
components from the chassis.

CAUTION:

Before front mounting the router in a rack, have a qualified

technician verify that the rack is strong enough to support the router's weight
and is adequately supported at the installation site.

To install the router using a lift (see

Figure 41 on page 75

):

1.

Ensure that the rack is in its permanent location and is secured to the building. Ensure
that the installation site allows adequate clearance for both airflow and maintenance.

2.

Load the router onto the lift, making sure it rests securely on the lift platform.

3.

Using the lift, position the router in front of the rack or cabinet, centering it in front of
the mounting shelf.

4.

Lift the chassis approximately 0.75 in. above the surface of the mounting shelf and
position it as close as possible to the shelf.