1 prepare controller for commissioning, Prepare controller for commissioning, 3commissioning – Lenze 8400 StateLine User Manual

Page 61

Advertising
background image

Lenze · 8400 StateLine · Reference manual · DMS 12.0 EN · 06/2014 · TD05/TD14

61

3

Commissioning

3.8

Commissioning of the "Switch-off positioning" technology application

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

3.8.1

Prepare controller for commissioning

1. Power terminal wiring.

Refer to the mounting instructions supplied with the drive controller to find help on how to

correctly design the power connections to match the requirements of your device.

2. Control terminal wiring.

In case of the application shown in illustration

[3-2]

, switch-off positioning without pre-switch

off, wiring according to the "

Terminals 2

" control mode makes sense:

3. Inhibit controller: Set terminal X4/RFR to LOW level or open contact.
4. Connect USB diagnostic adapter.
5. Switch on voltage supply of the controller.

• Without motor operation: Connect external 24 V supply.
• With motor operation: Connect mains voltage.

If the green "DRV-RDY" LED is blinking and the red "DRV-ERR" LED is off, the controller is ready for

operation and commissioning can proceed.

Related topics:

Automatic restart after mains connection/fault...

( 95)

LED status displays

( 421)

DI3

DI2

DI4
DO1
GIO

24I

DI1

RFR

24E

+

=

X4

Controller enable / reset error

Stop function 1
Stop function 2

CW rotat. quick stop / selection: switch-off pos. 1

CCW rotat. quick stop / selection: switch-off pos. 2