Electrical installation – Lenze 8400 User Manual

Page 191

Advertising
background image

Electrical installation

Devices in the power range 0.37 ... 22 kW (3/PE AC 400 V)

Terminal assignment of the power connections

6

191

EDS84ASC552 EN 9.1

Strip cables

X105

X106

;

;;

;

84MOTL001_a

84MOTL001_b

U, V, W

PE

T1, T2

b

c

e

a

d

f

g

h

[mm]

[mm]

[mm]

E84AVxxx3714

E84AVxxx5514

E84AVxxx7514

E84AVxxx1124

E84AVxxx1524

E84AVxxx2224

E84AVxxx3024xxS

30

65

7

90

9

95

30

10

E84AVxxx3024xx0

E84AVxxx4024

E84AVxxx5524

25

70

12 ... 14

125

12 ... 14

105

25

10

E84AVxxx7524

E84AVxxx1134

E84AVxxx1534

25

80

14

120

14

115

25

10

E84AVxxx1834

E84AVxxx2234

30

110

16

195

16

160

30

10

How to proceed:
1. Strip motor cable and cable for motor temperature monitoring according to

specified dimensions.

2. Fold back the shield of the motor cable and motor temperature cable over the cable

sheath. Keep unshielded ends short.

3. Fix shield on the cable sheath (e.g. using a heat-shrinkable tube).
4. Fasten wire end ferrule to PE cable.

– The other cables may be wired without using wire end ferrules.

5. Connect the shields separately to the shield sheet using (metal) cable ties or shield

clamps.
– left: motor cable
– right: cable of motor temperature monitoring
– For strain relief of the cables, measures are required.