Electrical installation – Lenze 8400 User Manual

Page 201

Advertising
background image

Electrical installation

Devices in a power range of 30 ... 45 kW (3/PE AC 400 V)

Terminal assignment of the power connections

6

201

EDS84ASC552 EN 9.1

Strip cables

X105

X106

;

;;

;

84MOTL001_a

84MOTL001_b

U, V, W

PE

T1, T2

b

c

e

a

d

f

g

h

[mm]

[mm

2

]

[AWG]

[Nm]

[lb-in]

[mm]

[mm

2

]

[AWG]

[Nm]

[lb-in]

[mm]

[mm

2

]

[AWG]

E84AVxxx3034

E84AVxxx3734

E84AVxxx4534

40 190 24 16 ... 50

6 ... 0

4.0

35

250 16 2.5 ... 25

12 ... 2

4.0

35

240 40 10 0.2 ... 1.5

24 ... 16

How to proceed:
1. Strip motor cable and cable for motor temperature monitoring according to

specified dimensions.

2. Fold back the shield of the motor cable and motor temperature cable over the cable

sheath. Keep unshielded ends short.

3. Fix shield on the cable sheath (e.g. using a heat-shrinkable tube).
4. Fasten wire end ferrule to PE cable.

– The other cables may be wired without using wire end ferrules.

5. Connect the shields separately to the shield sheet using (metal) cable ties or shield

clamps.
– left: motor cable
– right: cable of motor temperature monitoring
– For strain relief of the cables, measures are required.

Advertising
This manual is related to the following products: