Metrohm tiamo 2.3 Patch 1 (process analysis) User Manual
Page 1529
■■■■■■■■■■■■■■■■■■■■■■
7 Instruments
tiamo 2.3 Patch 1 (for Process Analysis)
■■■■■■■■
1513
Monitoring of GLP validity
Monitoring of GLP validity
on | off (Default value: off)
If this option is enabled then the time interval for the GLP test will be
monitored.
Monitoring can only be switched on when a date has been entered in
the field GLP test date.
GLP test interval
Time interval to next GLP test. If a value is entered here then the date in
the field Next GLP test will be adjusted automatically.
Can only be edited if monitoring is switched on.
Range
1 ... 999 days
Default value
999 days
Next GLP test
Date on which the next GLP test is to be carried out. The date can be
selected by pressing
in the dialog window Select date (see Chapter
2.5.1, page 92). After the date has been entered the field GLP test
interval will be adjusted automatically.
Can only be edited if monitoring is switched on.
Default value
GLP test date + 999 days
Message
The message options can only be edited if monitoring is switched on.
Message by e-mail
on | off (Default value: off)
If this option is activated, the message is sent to the e-mail address
defined under [E-mail...]. The message is sent in text format.
[E-mail...]
[E-mail...] opens the Send e-mail window (see Chapter 2.6.1, page 95).
Acoustic signal
on | off (Default value: off)
If this option is activated, an acoustic signal will be emitted additionally to
the message defined above