Metrohm tiamo 2.3 Patch 1 (process analysis) User Manual

Page 1561

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

7 Instruments

tiamo 2.3 Patch 1 (for Process Analysis)

■■■■■■■■

1545

Next GLP test

Date on which the next GLP test is to be carried out. The date can be

selected by pressing

in the dialog window Select date (see Chapter

2.5.1, page 92). After the date has been entered the field GLP test
interval
will be adjusted automatically.

Can only be edited if monitoring is switched on.
Default value

   GLP test date + 999 days

Message
The message options can only be edited if monitoring is switched on.

Message by e-mail

on | off (Default value: off)

If this option is activated, the message is sent to the e-mail address
defined under [E-mail...]. The message is sent in text format.

[E-mail...]

[E-mail...] opens the Send e-mail window (see Chapter 2.6.1, page 95).

Acoustic signal

on | off (Default value: off)

If this option is activated, an acoustic signal will be emitted additionally to
the message defined above

Action
The actions can only be edited if monitoring is switched on.

If during monitoring it is found that the validity period has expired then
one of the following actions will be triggered automatically at start test.

Selection

Record message | Display message | Cancel
determination

Default value

Display message

Record message
The message that the validity period has expired will be automatically
saved with the determination.
Display message
A message is displayed and you can select whether you want to con-
tinue the sequence or cancel it. If the sequence is continued then the
message that the validity period has expired will be automatically saved
with the determination.

Advertising