Metrohm tiamo 2.3 Patch 1 (process analysis) User Manual
Page 1561
■■■■■■■■■■■■■■■■■■■■■■
7 Instruments
tiamo 2.3 Patch 1 (for Process Analysis)
■■■■■■■■
1545
Next GLP test
Date on which the next GLP test is to be carried out. The date can be
selected by pressing
in the dialog window Select date (see Chapter
2.5.1, page 92). After the date has been entered the field GLP test
interval will be adjusted automatically.
Can only be edited if monitoring is switched on.
Default value
GLP test date + 999 days
Message
The message options can only be edited if monitoring is switched on.
Message by e-mail
on | off (Default value: off)
If this option is activated, the message is sent to the e-mail address
defined under [E-mail...]. The message is sent in text format.
[E-mail...]
[E-mail...] opens the Send e-mail window (see Chapter 2.6.1, page 95).
Acoustic signal
on | off (Default value: off)
If this option is activated, an acoustic signal will be emitted additionally to
the message defined above
Action
The actions can only be edited if monitoring is switched on.
If during monitoring it is found that the validity period has expired then
one of the following actions will be triggered automatically at start test.
Selection
Record message | Display message | Cancel
determination
Default value
Display message
Record message
The message that the validity period has expired will be automatically
saved with the determination.
Display message
A message is displayed and you can select whether you want to con-
tinue the sequence or cancel it. If the sequence is continued then the
message that the validity period has expired will be automatically saved
with the determination.