Security, L-force | plc designer – Lenze PLC Designer PLC Designer (R3-1) User Manual

Page 137

Advertising
background image

L-force | PLC Designer

Concepts and Base Components

DMS 4.1 EN 03/2011 TD29

135

3.18

Security
Project:
The access control for projects, particular objects resp. the right to perform certain
actions in a project can be configured and managed via dialogs of the Project Settings
and object Properties.
A project basically can be protected by an encrypted password, see Project Settings,
Security.
Access rights concerning objects always are assigned to particular user groups, not to
single users. For each object a list of allowed actions can be defined for each user
group.
Each particular user however can get an own password.
PLC:
Depending on the device there might be also an access control concerning objects and
files on the PLC.


Advertising