L-force | plc designer – Lenze PLC Designer PLC Designer (R3-1) User Manual

Page 451

Advertising
background image

L-force | PLC Designer

Menu Commands sorted by Categories

DMS 4.1 EN 03/2011 TD29

449

The actions:

Bind new objects to source control If you add a new object to the project, this will be bound to the

default data base location.

Get latest version after project
open

When you open the project, the latest version of all objects which
are under source control, will be copied from the above defined
data base folder to the project, whereby the local version of objects
will be overwritten.

Get latest version after changed in
the database

As soon as a newer version of an object is checked in to the data
base (for example by another user), the user will be informed.

Get latest version before build

If a build process is to be done for the current project, primarily the
latest version of all objects which are under source control, will be
copied from the above defined data base folder to the project,
whereby the local version of objects will be overwritten.

Checkout before object edit

As soon as you start to edit an object which is under source control,
the object will be checked out. If the object is currently already
checked out by another user (indicated by a red cross before the
object name in the »PLC Designer« object organizer), then an
appropriate message will pop up.

Checkin before project save

When the project is going to be saved, previously all objects, which
are under source control, will be checked in.

Checkin after successful build

After an error-free build of the project all objects, which are under
source control, will be checked in.


Advertising