Checkin, L-force | plc designer – Lenze PLC Designer PLC Designer (R3-1) User Manual

Page 494

Advertising
background image

L-force | PLC Designer

Menu Commands sorted by Categories

492

DMS 4.1 EN 03/2011 TD29

If the database version of the object to differs from that in the local project, an
appropriate message will be displayed and the user can decide whether the object
should be checked out anyway.
After the dialog has been closed with OK, the checked-out object will be marked with a
green check in thePOUs or Devices window of the local project. For other users it will
be appear marked with a red cross and will not be editable by them. To check in an
object use the Checkin... command.

Abb. 264 Checkout symbols

12.28.8

Checkin...

Symbol:

This command (category Source Control) checks in the checked-out object(s), currently
marked in the POUs or Devices window, to the data base. Thereby a new version of the
object will be created in the data base. The old versions will be kept anyway.
The Checkin dialog will open where a comment can be added which will be stored in
the version history of the object in the data base. Line breaks can be inserted by
<Ctrl>+<Enter>.

Abb. 265 'Checkin' dialog

Keep checked out: If this option is activated, the current version of the object will be
written to the database, but the object will remain in status "checked-out".

Advertising